Progress on the Friends' Shelter
We are continuing to make good progress. The forms were
stripped away today and the insulation was placed against the exterior
foundation. The short pillars are for the exterior columns at the
covered entrance. If you look closely you can also see the green
sleeve where the plumbing will pass through the wall between the lobby
and the hall on its way out to the pump tank which will be at the west
end of the building.
The silt fence has been
installed and the location for the transformer (northwest edge of the
site) has been identified by Alliant.